Sunday, November 14, 2010

Final check - PASSED. Test launch re-scheduled to 15.11.2010 13:00 +2GMT

Equipment final assembly - OK.
Verification - OK. 
Meteo balloon pressure - OK.  
Parachute link to meteo balloon - OK.  
Parachute link to container 1 - OK.  
GPS tracking system 1 - OK.  
GPS tracking system 2 - OK.  
GSM tracking system 3 - OK.  
Camera 1 - OK.  
Camera 2 - OK.  
Camera 3 - OK.  
Altimeter check - OK.   
Outside camera 1 - OK.  
Outside camera 2 - OK.   


False start - OK. 

Test launch re-scheduled to 15.11.2010 13:00 +2GMT

No comments:

Post a Comment